Bad floor work
It took a month for this company to do a few small rooms with tile. The first attempt was done by an unqualified tilerer, which had to be ripped up and completely done all over again. The second crew did a good job however; the last bathroom was done so quick that he hastily bolted my sink back in and ripped the drywall out without fixing it. Also, the caulking around the toilet looked like a child used a tube of toothpaste. Not to mention he left an obviously cracked tile at the doorway.
comments